Project features

Start:

End:

Dec 2023

Jun 2024

Location:

Client:

Uzbekistan

China Energy Intl Group CAS

ACWA Power signed an investment agreement with the MoE to design, finance, build and operate 2x500 MW Bash WPP and Dzhankeldy WPP. Client (EPC) hired Juru to develop design of integration of IdentiFlight system that has an independently proven ability to detect and identify eagles across vast regions and climates. The IdentiFlight system will connect to the Project’s SCADA system for automatic control of a wind project with a customized curtailment strategy. 


Services provided

  • Assess existing underground cable paths in preparation of IDF cable trench work. 
  • Review IdentiFlight system location microsite and protected/restricted location.
  • Design single mode fiber optic connection at the substation patch panel collection point, for distribution to be IdentiFlight base station.
  • Develop design of IdentiFlight pad connection to grounding grid and available ground connector rod/lug for IdentiFlight lightning protection conductor tie-in 
  • Liaison with IdentiFlight and WTG supplier to ensure the design integration and network integration to Envision SCADA and substation SCADA or other system
  • Calibration target pole embedment foundations for general locations along the wind farm grounds.
  • Provide IdentiFlight internet supply design and plan for permanent and continuous site access for commissioning, maintenance and service.
  • Support with the application of the relevant permit from local authorities including but not limited to the drone operation permit, environmental permit, etc.