LLP Vigor Holding
LLP Vigor Holding won Kazakhstan renewable energy auctions for the construction and operation of two solar PV plants —20 MW and 30 MW — in the Kyzylorda region, with both plants supplying electricity to the local grid operated by KREC at 35 kV. Juru was engaged by Vigor Holding to carry out detailed engineering design, energy yield assessment, grid integration studies, and local permitting to bring both PV plants to construction-ready stage.
Services provided
- Carry out feasibility and technology selection, including comparative analysis of PV technologies and optimal site configuration
- Prepare bankable energy yield assessment with P50/P90 generation reports
- Develop general layout design including earthworks optimization (Cut & Fill) and internal road network
- Design foundations tailored to local soil corrosion levels and pile load testing analysis
- Perform statical calculation of mounting structures and equipment foundations compliant with local wind/snow norms
- Develop complete electrical system design from DC stringing to MV (35 kV) collection
- Conduct grid compliance study
- Design grid interconnection including detailed engineering of the grid interface and transmission line in accordance with Technical Specifications
- Prepare Statement on Environmental Impact as per local requirements
- Support obtaining local State Expertise approvals