Project features

Start:

End:

Jan 2026

Jul 2026

Location:

Client:

Uzbekistan

EBRD

EBRD supported the Government of Uzbekistan and JSC NEGU to strengthen the country’s transmission grid by preparing a follow-up investment project aimed at accommodating rapid demand growth and large-scale renewable energy integration. The project includes the construction of new 500/220/110/10 kV substation.

Juru was engaged to deliver the complete technical, financial, E&S due diligence of the project, aligned with national legislation (Presidential Decree PD-51) and EBRD project preparation standards. The assignment was structured in two phases: preparation of the Project Concept for national approvals, followed by full-scale due diligence and preparation of the Project Appraisal Document.

Services provided

  • Carry out power system analysis and simulations using DIgSILENT PowerFactory, covering summer/winter and demand variation scenarios.
  • Evaluate system adequacy and N-1 contingencies, and estimate project benefits, including loss reduction and renewable energy integration.
  • Site selection, minimize environmental and social risks, and support NEGU in obtaining approvals from relevant authorities.
  • Conduct high-level stakeholder consultations and map potential constraints (ecological, cultural, infrastructure-related).
  • Conduct field missions and walkover surveys to verify site location and perform detailed E&S mapping, including habitat screening.
  • Develop Project Concept, including multiple technical options and high-level screening of technical, environmental, and social aspects.
  • Prepare financial and economic analysis, including CAPEX/OPEX estimation and cost-benefit assessment.
  • Develop basic design for substation, including SLDs, technical requirements, BoQs, etc.
  • Prepare Preliminary (Stage I) National EIA reports in accordance with Uzbek regulations and conduct public hearings in affected regions.
  • Assist NEGU in compiling and submitting documentation for state authorities and EBRD approvals.
  • Develop Concept and PAD documents as per PD-51.
  • Obtaining necessary approvals from government authorities, MIIT and MoE.