Project features
Start:
End:
Mar 2021
Dec 2023
Location:
Client:
Uzbekistan
EBRD
The GoU has launched a 1 GW Wind Program, supported by EBRD for the development of wind power projects under PPP modality (the Program). The Consultant has already supported the phase 1 of the Program, a 100 MW wind power plant in Karakalpakstan, Uzbekistan. The EBRD hired the Consultant to help identify new sites for further development and to implement the Second Wind Project including:
- Preliminary desktop-based assessment of the list of sites for construction of wind farm identified by the GoU and selection of 3 most suitable sites for further development, for third and subsequent phases of the Program;
- Conduct wind resource measurement, site assessment and E&S studies for the Second Wind Project;
- Prepare conceptual wind park layout and yield assessment, preliminary geotechnical investigations, power evacuation study, cost estimation and technical risk analysis;
- Implement legal review, financial and economic analysis, risk analysis and project structuring;
- Prepare the tender documents for EoI, RFQ and RFP stages including drafting project agreements;
- Implement tender procurement support, bid evaluation and conduct negotiations with the preferred bidder.
Services provided
Juru acts as a Technical, Environmental and Social Advisor and covers the following:
- Define criteria for assessment of the long list of sites proposed by the Authorities;
- Perform preliminary desktop-based E&S and grid assessment of the proposed sites;
- Recommend up to 3 sites for further development based on the assessment according to the defined criteria;
- Support import and customs clearance of the wind measurement equipment, providing consignee services;
- Perform detailed assessment of the Second Wind Project site including:
- Site conditions assessment – analysing terrain and site access roads;
- Preliminary geotechnical investigation as per ASTM standards;
- Grid connection study, including the power flow modelling, equipment selection and obtaining the Technical Condition from the grid operator;
- Environmental and social assessment of the Project site and associated facilities, including access road;
- One-year bird monitoring campaign including Collision Risk Modelling.
- Support structuring of the transaction;
- Preparation of tender documents for EoI, RFQ and RFP stages, including minimum technical and E&S requirements, appendices and schedules of the PPA;
- Evaluation of bids against technical and E&S criteria;
- Support in negotiations with the Successful Bidder, assistance in finalizing of the project agreements.