Project features
Start:
End:
Oct 2023
Oct 2024
Location:
Client:
Uzbekistan
EBRD
The EBRD considered financing to the Republic of Uzbekistan, with on-lending to the Joint Stock Company National Electric Grid of Uzbekistan (NEGU JSC), to undertake the construction of a 230 km, 500 kV transmission line between the settlements of Sarimay (Khorezm region) and Muruntau (Navoi region). The main purpose of the assignment was to carry out a detailed analysis of the project and to prepare a project preparation study at a level sufficient for the Bank to make a financing decision, as well as to conduct a Local Feasibility Study meeting the requirements of the local authorities for project approval.
Services provided
- Scoping Report and Terms of Reference (ToR) for the ESIA;
- Stakeholder Engagement Plan (SEP) and Grievance Redress Mechanism (GRM);
- Environmental baseline surveys, including noise measurements, air quality measurements, soil sampling, and water sampling;
- Biodiversity surveys, including habitat/botanical survey, habitat mapping, herpetological survey, and mammal survey;
- Socio-economic baseline surveys, including a socio-economic survey, cultural heritage assessment, and stakeholder consultations;
- Full ESIA package, including the Non-Technical Summary (NTS), ESIA Report, Environmental and Social Management Plan (ESMP), and Environmental and Social Action Plan (ESAP);
- Stakeholder engagement activities and public disclosure of the ESIA;
- Supplementary reports, including the Climate Risk Assessment Report, Human Rights Risk Assessment (HRRA), and Critical Habitat Assessment Report.